The timeline of a wind turbine
Wind turbines are designed to provide reliable energy for approximately 30 years before turbines can be safely removed and newer, more efficient machines installed.
Before construction, and together with the wind farm owner, we create a plan to safely and sustainably decommission wind turbines and related infrastructure at the end of the wind project’s life. Ultimately, it is our customers, the wind farm owners, that then have the responsibility for final decommissioning. Decommissioning starts 18-24 months before operations end and is completed within 12-24 months. At the end of their lifecycle, the different components of a wind turbine can, depending on the component and condition, either be sold second-hand, refurbished, reused, recycled, or disposed of in landfills.